RCC CONSTRUCTION TECHNOLOGY OF DOUBLE-CURVATURE ARCH DAM OF LONGTAN RESERVOIR
Longtan reservoir is the first high RCC double-curvature thin arch dam with the maximum height of 85m in Sichuan province,which characterized with its complex geological conditions,strong technology and great construction difficulty.This paper mainly introduces the material selection and mix ratio design of RCC,the construction process of mixing,transportation,compaction and maintenance,and the construction technology of adding MgO to dam and the temperature control measures adopted in construction,which ensure the quality of RCC construction and greatly improve the production effectiveness.
double-curvature arch dam RCC add MgO to dam construction process temperature control
LI Zhi-wei Qin Xiao-liang ZHANG Tao ZHANG Yi-chi
PowerChina Guiyang Engineering Corporation, Guiyang 550081, Guizhou, China