会议专题

CONSTRUCTION METHODS FOR SUSU RCC DAMS IN ULU JELAI HYDROELECTRIC PROJECT

  SUSU RCC Dam is the main part of the Ulu Jelai Hydroelectric Project (UJHEP) which has been developed by Tenaga Nasional Sdn Berhad (TNB) in the Cameron highlands of Malaysia and was completed successfully in 2016.The purpose of this paper is to describe the experiences and lessons learned during the construction of Susu RCC Dam including cost-effective solution with low cement content mix design,Sloped Layer Method (SLM) of RCC placement,the geomembrane system over the upstream face of Susu RCC dam,and then focus on the construction methodology of production and transportation of RCC with the conveyor system,RCC placement and compaction.

Low cement content mix design Sloped Layer Method geomembrane

Ahmad Dolatkhahi

Fort St John, Box 6100 Site C Dam, BC, VIJ 4H6, Canada

国际会议

the 8th International Symposium on Roller Compacted Concrete (RCC) Dams(第八届国际碾压混凝土大坝国际研讨会)

昆明

英文

389-399

2019-11-11(万方平台首次上网日期,不代表论文的发表时间)