会议专题

Design and Optimization of PHC Pipe Pile in Binzhou Port

  The problems of the frame-fixed row-pattern pile cofferdam structure construction are analyzed based on the correlative situation of cofferdam in Haigang district of Binzhou port for liquid bulk cargo operation.According to the problem,two schemes to optimize the frame-fixed row-pattern pile cofferdam structure are proposed.After the calculation and analysis of the bearing capacity of PHC pile,the scheme of changing pile diameter or pile length is proposed.The two schemes are compared economically and the optimal scheme is determined,in the hope that this scheme can be used as a reference for later construction.

Binzhou port The frame-fixed row-pattern pile cofferdam structure The PHC pipe pile Design optimization

Xiaowen Bian Xiaoli Ren Zhaojun Ren

Department of Architectural Engineering,Binzhou Polytechnic,Binzhou,256603,China

国际会议

2018 7th International Conference on Advanced Materials and Computer Science (ICAMCS 2018) 2018第七届先进材料与计算机科学国际会议(ICAMCS 2018)

大连

英文

279-284

2018-12-21(万方平台首次上网日期,不代表论文的发表时间)