Construction Control of Long-span Prestressed Concrete Continuous Steel Frame Bridge Based on Grey Prediction
Prestressed concrete continuous steel bridge is widely used in different road structures because of its unique advantages such as economical cost,simple structure,comforTable driving and simple construction.The construction control of long-span prestressed concrete continuous steel frame bridge has become the main link of bridge construction.Therefore,in order to ensure the smooth construction of related bridge projects and meet the corresponding design requirements,it is necessary to strictly implement the construction control method of long-span prestressed concrete continuous steel frame bridge.Based on the grey prediction method,this paper studies the main contents and influencing factors of the construction of long-span prestressed concrete continuous steel frame bridge,and then analyses the construction control methods of long-span prestressed concrete continuous steel frame bridge.
Grey prediction Prestressed concrete Continuous steel frame bridge Construction control
Li Jianhua
Guangzhou City Construction College,Guangzhou,Guangdong,China
国际会议
长春
英文
16-20
2019-10-11(万方平台首次上网日期,不代表论文的发表时间)