会议专题

Optimization Design of Treating Slope Dangerous Rock Mass in Penglai Pavilion

  Slope dangerous rock mass is a common geological hazard in mountain.This paper take the dangerous rock mass of Penglai Pavilion slope as an example that puts forward the design concept of cleaning up dangerous rock mass on the principle of first easy,difficult afterwards,first on and below,first pry,then top,first push,then push.We put forward the protective measures using SNS active protective net in view of the dangerous rock mass on the slope of Penglai Pavilion.In addition,we also put forward a water cut wall which is made of reinforced concrete structure and arranged three plain concrete structures on the slope.At the same time,we also used to slope masonry retaining wall do to do comprehensive governance.The design has been successfully carried out in Penglai Pavilion and has reference and reference for similar projects.

Penglai Pavilion slope dangerous rock mass improve optimization design

Ying Yang Binghua Zhou

Shandong Provincial Geo-mineral Engineering Exploration Institute,Jinan 250014,China Geotechnical and Structural Engineering Research Center,Shandong University,Jinan 250061,China

国际会议

2019 International Conference on Civil Engineering, Materials and Environment (ICCEME 2019)(2019国际土木工程、材料与环境会议)

长春

英文

88-93

2019-10-11(万方平台首次上网日期,不代表论文的发表时间)