会议专题

Simulation Analysis on Impacts on Existing Highway from Pipeline Underpassing Based on ANSYS

  Pipeline construction underneath existing highway leads to settlement deformation of the existing highway thus bringing potential security risks to highway quality and traffic safety.Taking pipeline underpassing of G93 Highway as the research object,this thesis utilizes ANSYS Finite Element Simulation Software and Mol-coulomb Criterion to establish model and realizes burial depth simulation through equivalent gravity field.Results show that vertical displacement of earthing on the top of burial depth pipeline mainly appears as vertical settlement,whose maximum value reaches 15.3mm.The maximum shearing stress value of subgrade soil is 0.051MPa.Shearing stress of materials is within the range of shearing strength.Pipeline structure right below the highway is secure.

Highway Pipeline underpassing Potential security risks ANSYS

Ming-cui ZHANG Yi-shu WANG Deng-feng CHEN Si-chang WANG

Yunnan Highway Engineering Supervision and Consultancy Co.,Ltd.,Kunming,Yunnan,650021,China School of Civil Engineering and Architecture,Chongqing University of Science and Technology.401331,C

国际会议

2019 International Conference on Civil Engineering, Mechanics and Materials Science (CEMMS 2019)(2019国际土木工程、力学和材料科学会议)

长沙

英文

36-41

2019-08-30(万方平台首次上网日期,不代表论文的发表时间)