会议专题

Research on Dynamic Scheduling Strategy of Workshop Intelligent Processing System

  The bilateral assembly line balancing problem of intelligent processing systems is different from the traditional one-sided assembly line balancing problem, which mainly considers the priority of tasks, the operating orientation and the requirements of bilateral parallel operations. Firstly, the core algorithm of multi-objective optimization model based on constraints is established. Secondly, the model uses the heuristic balancing algorithm based on grouping strategy to perform task grouping scheduling and task group selection. The second type of equilibrium model of the bilateral assembly line common to the two processing steps; finally, the particle swarm optimization based on the dynamic step size to obtain the system efficiency of the two process processing.

RGV production scheduling multi-objective optimization bilateral assembly line balance model particle swarm optimization based on dynamic step size improvement

Yongqi Yang

Shandong University of Science and Technology, Jinan, China

国际会议

2019 6th International Conference on Machinery, Mechanics, Materials and Computer Engineering (MMMCE 2019)(2019 第六届机械、材料和计算机工程国际会议)

呼和浩特

英文

802-808

2019-07-27(万方平台首次上网日期,不代表论文的发表时间)