Research on the problem of IPPS considering order inserting
In view of the problem of rush order processing under the Integrated Process Planning and Scheduling (IPPS), various factors that affect the order priority are considered comprehensively and the gray correlation analysis method is adopted to determine the priority of the original order and rush order.According to the order priority, considering the penalty for the advanced and delayed workpiece completion, for the minimum linear weighted sum of the penalty cost and the completion time as the objective function, the corresponding mathematical model is established and sovled.Hence, a satisfactory scheduling scheme can ensure that the orders with high priority are completed as scheduled.
Process Planning Workshop Scheduling Order Priority Gray Correlation
Yu-xi LI Zheng-yu LI Hong-bin XU Lin-hai HOU Ming-shun YANG
Xian Modern control technology Research institute, Xian 710065, Shaanxi, China School of Mechanical and Precision Instrument Engineering, Xian University of Technology, Xian 710
国际会议
2018 International Conference on Defence Technology (2018国际防务技术会议)
北京
英文
387-390
2018-10-21(万方平台首次上网日期,不代表论文的发表时间)