会议专题

Environmental licensing challenges of Xingu Rio transmission system route definitions

  Based on the Brazilian electric sector planning, by 2026 the transmission grid will be increased by 64 thousand km.In this context, the analysis of how to incorporate the environmental criteria in the discussions of route optimization is important for the decision-making of the stakeholders (government, environmental agencies and entrepreneurs).Therefore,this article identifies the challenges of the incorporation of the socio-environmental criteria for the route optimization as well as the deadlines and costs of the Xingu-Rio Transmission System known to be the largest transmission system in Brazil.

Environmental factors Environmental licensing Brazil Transmission lines

Ricardo Abranches Felix Cardoso Alessandra Schwertner Hoffmann

Agriculture and Environmental Engineering Department-Engineering School.Universidade Federal Fluminense.R.Passo da Pátria, 156-237-S(a)o Domingos, Niterói-RJ, Brazil, 24210-240

国际会议

2019 United Nations ESCO International Water Conference (UNESCO-IWC 2019) Proceedings of Sustainable Water and Energy Forum (2019联合国教科文资质水资源大会水资源与能源发展分论坛)

法国巴黎

英文

18-25

2019-03-13(万方平台首次上网日期,不代表论文的发表时间)