Environmental licensing challenges of Xingu Rio transmission system route definitions
Based on the Brazilian electric sector planning, by 2026 the transmission grid will be increased by 64 thousand km.In this context, the analysis of how to incorporate the environmental criteria in the discussions of route optimization is important for the decision-making of the stakeholders (government, environmental agencies and entrepreneurs).Therefore,this article identifies the challenges of the incorporation of the socio-environmental criteria for the route optimization as well as the deadlines and costs of the Xingu-Rio Transmission System known to be the largest transmission system in Brazil.
Environmental factors Environmental licensing Brazil Transmission lines
Ricardo Abranches Felix Cardoso Alessandra Schwertner Hoffmann
Agriculture and Environmental Engineering Department-Engineering School.Universidade Federal Fluminense.R.Passo da Pátria, 156-237-S(a)o Domingos, Niterói-RJ, Brazil, 24210-240