会议专题

Research on situation of Yalong River hydropower utilization by UHV transmission

  The Yalong River has rich hydropower resources, there are twenty-two hydropower stations planed on its main stream.The hydropower resources of its downstream has been fully developed.The hydropower of Jinping first stage hydropower station(JinXi), Jinping second stage hydropower station(Jindong), Guandi hydropower station is transmitted to East China through JinSu UHV.The power generated by Ertan hydropower station and Ruoshui hydropower station is utilized in Sichuan and Chongqing.In the future, when the hydropower resources of midstream is fully developed, it will face some problems, for example, the hydropower will be transferred to different direction, utilized in different region,and operated by different institutions.Therefore, in this paper we researched on the situation and capatcity of power transmission, relevant planning, operation situation of the power system, power demand of the accepting regions in order to guide the operations of hydropower stations and dispatching schemes.

UHV Yalong River Hydropower Utilization

Yu Zhao Linfeng Li Jianping Wang Chunlei Huang

Nari Group Corporation/State Grid Electric Power Research Institute, No.19 ChengXin Road, NanJing 211106, P.R.China

国际会议

2019 United Nations ESCO International Water Conference (UNESCO-IWC 2019) Proceedings of Sustainable Water and Energy Forum (2019联合国教科文资质水资源大会水资源与能源发展分论坛)

法国巴黎

英文

80-84

2019-03-13(万方平台首次上网日期,不代表论文的发表时间)