会议专题

Large-Scale outer hydropower integration into east China Grid: Problems and Solutions

  East China Grid (ECG) is the main hydropower receiver of the West-East power transmission channel in China.It has experienced a rapidly increasing scale of hydropower integration in the past decade.Currently, the large-scale outer hydropower is one of important power sources for ECG.However, integrating rapidly increasing outer hydropower into the power grid is suffering from a series of serious problems.Therefore, this study takes into account the load demands and hydropower transmission characteristics to analyze several major problems and find solutions for solving them.The power supply-demand balance problem, hydropower transmission schedule problem, and peak-shaving problem are considered in this study.Correspondingly, three solutions are suggested, including the coordination between the outer hydropower and local power sources, inter-provincial power complementary operation, and introducing market mechanism.This study will be helpful for ECG to effectively receive more and more outer hydropower in the future.

Hydropower integration Multi-energy coordination Multi-power grid coordination East China Grid (ECG)

Jianyu Lu Jianjian Shen Qianqian Shen

Dispatching control center, East China Grid Co.Ltd., Shanghai, 200002, P.R.China Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian, 116024, P.R.C

国际会议

2019 United Nations ESCO International Water Conference (UNESCO-IWC 2019) Proceedings of Sustainable Water and Energy Forum (2019联合国教科文资质水资源大会水资源与能源发展分论坛)

法国巴黎

英文

106-110

2019-03-13(万方平台首次上网日期,不代表论文的发表时间)