Technical study on the slope excavation procedure adjustment of Souapiti dam

  Top-bottom excavation procedure is the most common method for dam slope excavation, which is applicable to most cases.In terms of slop excavation of the Souapiti hydropower station project of Guinea, the challenge caused by tight schedule for excavation in the early stage of the Project was overcome by studying the topographic conditions of slope and the excavation design features of foundation surface and adopting the bottom-top excavation procedure with technical and safety measures in place.The bottom-top excavation method mentioned above is introduced for reference to other similar projects.

Slope excavation Measures in place Bottom-top Excavation procedure

Dan Zhu Xiaoming Dang Xuanwen Chen

China International Water & Electric Corp., CWE Mansion, No.3 Liupukang Street,Xicheng District, Beijing, 100120, P.R.China

国际会议

2019 United Nations ESCO International Water Conference (UNESCO-IWC 2019) Proceedings of Sustainable Water and Energy Forum (2019联合国教科文资质水资源大会水资源与能源发展分论坛)

法国巴黎

英文

199-202

2019-03-13(万方平台首次上网日期,不代表论文的发表时间)