会议专题

Scheduling and control co-design for networked wind energy conversion system

  Fieldbus, industrial Ethernet which is simple, reliable, economical and practical, is widely used in Wind Energy Conversion System (WECS), these techniques all belong to the field of networked control system.Network embedding to Wind Energy Conversion System brings many new problems.Implementing a control system over a communication network induces inevitable time delays that may degrade performance and can even cause instability.Wind energy conversion system reliable control problems based on networked control system theoretical framework is studied in this paper.A Kind of WECS with network-induced delay and packet dropout is modeled and adjustable deadbands are explored as a solution to reduce network traffic in WECS.A method to study the reliable control of WECS is presented, which takes into account system response as well as network environment.After detailed theoretical analysis, the simulation results is provided,which further demonstrated the proposed scheme.

Wind Energy Conversion System (WECS) Networked Control System (NCS) Time-delay Deadband Package-dropout

Zhihong Huo Zhixue Zhang

College of Energy and Electrical Engineering, Hohai University, Nanjing 210098, Jiangsu, Province P. Research & Development Center, Nari-Relays Electric Co., LTD Nanjing, 211106, Jiangsu, Province P.R.

国际会议

2019 United Nations ESCO International Water Conference (UNESCO-IWC 2019) Proceedings of Sustainable Water and Energy Forum (2019联合国教科文资质水资源大会水资源与能源发展分论坛)

法国巴黎

英文

373-379

2019-03-13(万方平台首次上网日期,不代表论文的发表时间)