Study on Optimization of Fully Mechanized Working Face Arrangement Under the Influence of Geological Structure in Shallow Coal Seam

  Fold structure and fault exist in fully mechanized mining face of 2-2 seam in Buertai coal mine.The faults encountered in 22101 and 22102 face are many and complex,the density of fault structure is high,and the inclined angle with the working face is between 50°and 60°.During the mining process,the two sides of the roadway are deformed greatly by the influence of geological conditions,and the phenomenon of roof and floor breaking is very serious.Combined with the above problems,this paper analyzes the rationality of length design of 2-2 coal seam working face.The length parameters of the working face are calculated by fitting the control theory of the rock stratum and the measured data,and the following conclusions are obtained.The reasonable working face length of 2-2 coal seam in Buertai coal mine is more reasonable to take 250 meters,and the width of roadway pillar is designed to be 20 m.

Chen Tian Yingjie Liu

Shenhua Shendong Coal Group Liu Ta Coal Mine,Inner Mongolia,China Shenhua Shendong Coal Group Production Manage Dept.,Shan Xi,China

国际会议

The 2nd International Symposium on Application of Materials Science and Energy Materials (SAMSE 2018) 第二届材料科学应用与能源材料国际研讨会2018年

上海

英文

1-7

2018-12-17(万方平台首次上网日期,不代表论文的发表时间)