Modeling of joint water-supply scheduling with multi-source in Beijing under uncertain conditions
After the Middle Route of South-to-North Water Transfer Project (SNWTP) finished,a pattern of joint water-supply including SNWTP water,the surface water of Miyun reservoir and underground water has been formed in Beijing.In view of the uncertainty in water-supply scheduling,this study takes 2020 as the planning year,and the influence of uncertain factors on the system cost was fully considered by interval two stages planning method.In order to minimize the total water-supply cost,a joint water-supply scheduling model in Beijing has been established,which reflects the actual situation of the joint watersupply system with multiple sources.The results illustrate that the minimum water-supply cost of Beijing will be 14.6,25.4 billion yuan in 2020,and the optimal water-supply of Miyun reservoir,groundwater and SNWTP water expected to be 0.54,2.05 and 0.95 billion m3,respectively.
Xiaojun Dou Hejia Wang
Institute of Water Resources for Pastoral Area,MWR,010020 Hohhot,China; China Institute of Water Res China Institute of Water Resources and Hydropower Research,100038 Beijing,China
国际会议
2018 International Symposium on Water System Operations(ISWRSO 2018)(2018年水资源系统及调度国际研讨会)
北京
英文
1-6
2018-10-12(万方平台首次上网日期,不代表论文的发表时间)