Simulation and Analysis of Accident Condition and Coping Operations of The Dian Zhong Water Diversion Project

  In this paper,according to the characteristics of Dian Zhong Water Diversion Project,as big flow,small cross section,and insufficient escaping capacity,a numerical model of the project is developed.In addition,with analysis,a worst accident condition and operations dealing with it are developed and simulated by the numerical model.With the simulation results,a checking condition is suggested to the structure design.

Yibo Yan Huiyong Huang Yongyan Wu Hui Wan

Changjiang Institute of Survey,Planning,Design and Research,Wuhan,Hubei,China

国际会议

2018 International Symposium on Water System Operations(ISWRSO 2018)(2018年水资源系统及调度国际研讨会)

北京

英文

1-4

2018-10-12(万方平台首次上网日期,不代表论文的发表时间)