Comprehensive Benefit Allocation for Joint Operation of Multiple Reservoirs in the Ningbo Based on Shapely-Value Method and Benefit-Incremental Method

  With the completion of interconnection project of the Eastern Reservoir Group,it is possible to realize the joint operation of the multiple reservoirs in the Ningbo,and integrated dispatching involving water supply and power generation has significant benefits.Based on the inequality of multi-stakeholders and the irrationality of benefit allocation in the cascade reservoir,this paper takes the joint operation of three reservoirs in Ningbo as an example and establishes a Shapley-value and benefit-incremental model,aiming at quantifying and sharing the compensation benefits.Results show that this method not only has strong operability,but also it has clear objectives that can be quantified.Moreover,this method takes the actual contribution value of different stakeholders into consideration.Thus,adopting this method is able to give full play to the enthusiasm of different reservoirs and achieve the maximum comprehensive benefit of the reservoir group.

Peibing Song Chao Wang Guanshe Yang Xiao Jing Gongbo Ding

College of Civil Engineering and Architecture,Zhejiang University,Hangzhou 310058,China State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of W Ningbo Raw Water Group Co.,Ltd.,Ningbo 315000,China School of Water Resources and Environment,China University of Geosciences(Beijing),Beijing,100083,Ch

国际会议

2018 International Symposium on Water System Operations(ISWRSO 2018)(2018年水资源系统及调度国际研讨会)

北京

英文

1-5

2018-10-12(万方平台首次上网日期,不代表论文的发表时间)