会议专题

Joint optimization of cascades in Yalong River and the middle and downstream of Jinsha River

  The main tributaries of the upper reaches of the Yangtze River are not only the strategic base for Chinas water resources,but also an important hydropower base for the “West-East Power Transmission Strategy.With the completion of these reservoir groups,a large-scale mixed reservoir system across the different basins has been formed,which makes the requirements for joint optimization and scheduling of large-scale hydropower system getting higher and higher.This paper focuses on the key problems faced by the joint optimization of large-scale hydropower system in the basin.Taking the Yalong River and the middle and downstream of the Jinsha River as the research area,the hybrid optimization method is introduced herein to solve the joint optimal scheduling model.The results reveal that the power generation by joint optimal scheduling is much more than separately scheduling,and the total power generation increased by 2.84%on average.As Mid-Jinsha cascade and Yalong River cascade has a 690 million kW·h and 190 million kW·h decrease in power generation respectively,the downstream Jinsha River cascade has a power generation increase of 4.31 billion kW·h.

ZHANG Hairong LI Peng REN Yufeng LIANG Zhiming CHEN Yufan LI Chunlong

China Yangtze Power Co.,Ltd.,Yichang 443133,China China Three Gorges Projects Development Company Limited,Chengdu 610041,China

国际会议

2018 International Symposium on Water System Operations(ISWRSO 2018)(2018年水资源系统及调度国际研讨会)

北京

英文

1-5

2018-10-12(万方平台首次上网日期,不代表论文的发表时间)