会议专题

SWOT Analysis of Asset-backed Securitization in PPP Projects

  Infrastructure PPP projects usually have large investments in the early stage and long operating cycles,which brings significant financial pressure to enterprises engaged in investment and construction of PPP projects.Asset-backed securitization is a breakthrough in traditional financing methods.This paper introduces the basic principles of asset-backed securitization and using SWOT analysis to study the strengths,weaknesses,opportunities and threats,and analyse the feasibility and practical significance of applying asset-backed securitization in PPP projects of infrastructure.

Asset-backed securitization PPP SWOT

Wu Guotong Li Yanxi Zhao Yanyan

Faculty of Management and Economics,Dalian University of Technology,Dalian,China,116024 Jingjinji Regional Company PowerChina RoadBridge Group CO.,LTD,Beijing,China,100048

国际会议

The 10th (2018)International Conference on Financial Risk and Corporate Finance Management(第十届(2018)金融风险与公司金融国际研讨会)

大连

英文

349-353

2018-07-06(万方平台首次上网日期,不代表论文的发表时间)