OVERVIEW OF THE DESIGN,FABRICATION & CONSTRUCTION OF CFRP PRESTRESSED CONCRETE GIRDER BRIDGE

  structurally deficient and functionally obsolete two-span reinforced concrete girder bridge in Taylor County,Kentucky was replaced in 2015 with a single span precast prestressed concrete girder bridge.CFRP prestressing strands were used to pretension the girders and stainless steel rebars were used for shear and deck reinforcement.The use of a Precast Prestressed hybrid decked bulb T-beam allowed for accelerated bridge construction,while the non-corrosive nature of the prestressing and reinforcing elements results in a low maintenance bridge with an expected service life beyond a hundred years.Compared to bridge girders with prestressed steel strands,additional steps and considerations are involved in the design and fabrication process.Details are presented for the analysis,design,fabrication,and placement of the CFRP prestressed girders in the field.

CFRP Prestressing Strands Stainless Steel Rebars Fabrication Field Deployment

Abheetha Peiris Issam Harik

Kentucky Transportation Center,University of Kentucky,Lexington,KY USA Department of Civil Engineering,University of Kentucky,Lexington,KY USA

国际会议

the Sixth Asia-Pacific Conference on FRP in Structures (APFIS2017)(第六届亚太纤维增强复合材料结构工程国际会议暨第十届全国建设工程FRP应用学术交流会)

新加坡

英文

1-5

2017-07-19(万方平台首次上网日期,不代表论文的发表时间)