Application of Mechanical Calculation Model for Overhead Transmission Line on Suspension Tower
The on-line monitoring system for overhead transmission lines requires accurate monitoring of the icing status of transmission lines.Based on the ice model of the suspension tower overhead line of South China University of Technology,this paper puts forward the calculation method of on-line monitoring of the ice content range based on the historical monitoring data,and analyzes the parameters of obliquities and the equivalent wire length And other factors on the calculation model of icing,the use of the Southern Power Grid disaster(icing)monitoring and pre-warning system monitoring data and on-site acquisition of artificial ice data to verify the effectiveness and accuracy of the above method.
icing overhead transmission line on-line monitoring styling historical monitoring data angle
HUANG Weiquan HAO Yanpeng YAO Zhaohong YANG Lin LI Hao WANG Junke LI Ruihai
School of Electric power South China University of Technology Guangzhou,China China Southern Power Grid Research Institute China Southern Power Grid Guangdong China
国际会议
重庆
英文
1-5
2017-09-25(万方平台首次上网日期,不代表论文的发表时间)