Virtual Machine Migration Strategy in Cloud Computing
In a typical cloud based data centre,several physical machines(PM)host dozens of virtual machines(VM),which run various applications and services.VM load varies according to the different type of usersapplications and traffic,and sometime this traffic may overwhelm VMs resources.Physical machines that host many VMs have limited capacity and if they are overloaded their performance might degrade or completely fail.A VM machine that hosts several different applications on a heavily loaded PM can be migrated to another underloaded PM in order to exploit the availability of the resources and to balance the load.In data centres,VMs exposed to huge amount of user traffic,if VM migration occurs on a network link that is overwhelmed with user traffic,then it will create a bottleneck if theres not enough bandwidth on the link to support the VM migration.Therefore,there is a clear need for mechanisms to control user traffic on both source and destination PMs in order to provide guaranteed bandwidth that needed for VM migration.
Virtual Machine(VM) Physical Machine(PM) VM Migration Load Balancing Cloud Computing
S.Liyanage S.Khaddaj J.Francik
School of Computing and Information Systems Kingston University Kingston upon Thames,United Kingdom
国际会议
贵阳
英文
147-150
2015-08-18(万方平台首次上网日期,不代表论文的发表时间)