A simulation-based framework for estimating probable open-pit mine closure time and cost

  Today, the technical challenges for estimating closure time and cost are two significant parts of mine closure management.In this paper, a simulation-based framework is established to determine the probable open-pit mine closure times and mine closure costs.The model incorporates the price uncertainty into the probable mine closure time.To estimate more accurate mine closure costs the Hutchisons technique was modified using the predefined mine closure time.The Hutchisons technique uses Monte Carlo method and decision tree analysis to provide mine closure cost estimation in a probabilistic manner.The proposed framework is applied in a 2D hypothetical geological model.The results showed that the model works well and it can be used for real cases.

Morteza Paricheh Morteza Osanloo

Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran

国际会议

The 2nd International Symposium on Land Reclamation and Ecological Restoration (第二届国际土地复垦与生态修复学术研讨会)

西安

英文

37-46

2017-10-20(万方平台首次上网日期,不代表论文的发表时间)