会议专题

REDUCING THE CRITICAL PATH FOR IN SITU CONSTRUCTION OF CONCRETE VIADUCTS BUILT WITH MOVABLE SCAFFOLDING

  Modern geometrical requirements for high capacity ground infrastructure, as highways or high speed train lines, imply increasing number of long tunnels and viaducts in mountainous countries.Moreover, for the sake of the environment, only some selected construction methods are eligible for sensitive areas.Among them, a very popular one for medium span concrete viaducts is the span by span construction with movable scaffolding system.The method can be easily adapted to any geometry and, from an environmental point of view, only the shadow of the deck is spoilt during construction periods.Since its first application in the Kettiger Hangbrücke, (Germany) in 1959, this construction method has been applied extensively all around the world.The paper will describe the pros and cons of the method and will explain in detail the last developments made in order to reduce to a minimum the critical path, increasing its competitiveness.New construction sequences, non-standardized structural details, static and dynamic tests, finite element model analysis and recent already built examples will be described to illustrate the possibilities of the method.

Concrete Viaducts Travelling Scaffolding Movable Scaffolding System In situ construction

Jose TURMO

Department of Civil and Environmental Engineering, Universitat Politècnica de Catalunya BarcelonaTech, Spain

国际会议

The Fifteenth East Asia-Pacific Conference on Structural Engineering & Construction (2017第十五届东亚-太平洋结构工程及施工国际会议)(EASEC-15)

西安

英文

42-47

2017-09-11(万方平台首次上网日期,不代表论文的发表时间)