会议专题

Research on equivalent energy storage of cascade reservoirs for wind power accommodation

  With the increasing of wind power installed capacity, power peak-load regulation has become main restriction for wind power accommodation. With an aim at this problem, this paper suggests a novel method for solving wind power accommodation. Firstly, digging the inverse peak-load regulation capacity of cascade reservoirs, using adjustable cascade reservoirs capacity realizes an aim, when renewable energy surplus, hydro-plants station output is lower, and when renewable energy shortage, hydro-plants station output is higher. And then, a short-term programming formulation of the wind power maximum accommodation is built to realize an optimization dispatch of power system, where cascade reservoirs operation condition constrain is considered. Finally, this paper takes Gansu province as an example to analyze and verify this method.

wind power accommodation cascade reservoirs power peak-load regulation joint operation

Yong-tao XIE Hua WU Rong JIA Xiang-yu ZHENG Juan LI

Xian University of Technology,Xian 710048,Shaanxi Province,China Xian University of Technology,Xian 710048,Shaanxi Province,China;State grid Gansu province electric Xian University of Technology,Xian 710048,Shaanxi Province,China;State grid Gansu province electric

国际会议

2016中国国际供电会议(CICED2016)

西安

英文

1-5

2016-09-01(万方平台首次上网日期,不代表论文的发表时间)