Research on Maintenance Schedule Optimization of Distribution Network Including Distributed Generation
There are more load transfer schemes can be formed when some device is in maintenance with distributed generation. Considering the effect of distributed generation, within a maintenance time period of a month, a multi-objective minimum optimization framework on distribution network maintenance scheduling for total outage capacity, total switching times, as well as total network loss is developed on constraints of mutually exclusive and simultaneous maintenance. In addition, the NSGA-II algorithm with multi-period overall coding is applied to solve the model and the optimal maintenance scheme of a month is chosen based on priority order of objective function. The example results prove the validity of the multi-objective model and the NSGA-II algorithm in maintenance schedule of distribution network.
distribution network maintenance scheduling distribution generation NSGA-II
SHEN Pei-feng MEI Rui CHEN Xing-ying YU Kun ZHOU Dong-xu LUO Xin XU Hong-hua
Nanjing Power Supply Company,Nanjing,Jiangsu Province 210019,China College of Energy & Electrical Engineering,Hohai University,No.1,Xikang Road,Nanjing,Jiangsu Provinc College of Energy & Electrical Engineering,Hohai University,No.1,Xikang Road,Nanjing,Jiangsu Provinc
国际会议
西安
英文
1-6
2016-09-01(万方平台首次上网日期,不代表论文的发表时间)