会议专题

Structural Integrity Analysis of Nuclear Power Plant Pressure Vessel Penetration Nozzle Repaired

  Primary water stress corrosion cracking (PWSCC) has been observed in CRDM nozzles,BMI nozzles and other penetration nozzles.The industry has used the repair method of replacement of nozzles fabricated of Alloy 690.After the replacement of the nozzle,the structural integrity analysis of new nozzle and welds should be performed to ensure the pressure boundary compliance with the original design requirement.In this paper,the pressurizer top head instrument nozzle of PWR nuclear power plant is evaluated as a typical pressure vessel penetration nozzle.The results showed that the repaired nozzle satisfies the ASME Code design requirement and the crack growth of the postulated flaw in 40 years of the nuclear plant life is acceptable.

Penetration Nozzle J-groove Weld EPFM Fatigue Crack Growth NPP

Linwei Ma Jiasheng He Aaqin Shu Xiaotao Zheng Yan Wang

Wuhan Institute of Technology,206 Guangguyi Road,Wuhan 430205,China

国际会议

2016 International Symposium on Structural Integrity,ISSI—2016(2016国际结构完整性研讨会)

天津

英文

346-350

2016-05-26(万方平台首次上网日期,不代表论文的发表时间)