会议专题

Semi-Physical Simulation & Test System for Electromagnetic Wave Imaging

  In traditional R & D method of electromagnetic wave imaging equipment, testing the algorithm is only possible after the integration of their RF transceiver front-end and signal process & imaging back-end. This results in some problems and errors not being found in the early stages of design. In order to improve the development efficiency and reduce the risk, the semiphysical simulation & test including rapid prototyping and hardware-in-the-loop was introduced to the R & D procedure, and a V-mode based flow for the development of electromagnetic wave imaging equipment was proposed. Then an example system was implemented with multiple instruments for test and measurement integrated, by which the RF transceiver front-end and signal process & imaging back-end were designed and developed in parallel and most tests would have been done during their development. This led to early detection of problems and errors being achieved. The system has been applied to the R & D of ultra-wide band (UWB) microwave and terahertz (THz) wave imaging system.

rapid prototyping hardware-in-the-loop automatic test system ultra-wide band (UWB) imaging terahertz (THz) imaging

Fenggui Wang Xiuwei Yang Yanbo Zhang

Institute of Automation Shandong Academy of Sciences Jinan 250014,Shandong Province,China

国际会议

2015 Fifth International Conference on Instrumentation and Measurement,Computer,Communication and Control (IMCCC2015)(第五届仪器测量、计算机通信与控制国际会议)

秦皇岛

英文

1562-1565

2015-09-18(万方平台首次上网日期,不代表论文的发表时间)