会议专题

Research on the estimation method of system-level maintenance time based on time extension

  There usually are some maintainability on the device in the process of equipment development, but,these maintenance time got from these experiment is device-level and can not be used to assess the system-level maintenance time directedly.This work introduces an estimation model and method of system-level maintenance time based on extension of device-level maintenance time.Firstly, to get the system-level dismounting time through simulation in JACK, using the resource database of maintenance therblig time.Then,to extend device-level maintenance time into the samples of system-level maintenance time on the base of system-level dismounting time.And,the samples are used to estimate maintenance time parameters.This method has two main advantages.The first one is to avoid taking fault imitation experiment and its destructiveness when samples are not enough.The second one is being able to assess the equipment maintenance time more accurately in the early time of equipment development.

Time extention model simulation extention method estimation method

LI Qin YANG Shan-chao QI Yan-qing HUANG De-suo ZHENG Ying-ying Li jun

Eleven Department,Army Officer Academy The Graduate Management Team,Army Officer Academy,Hefei230031,Anhui,China

国际会议

The 7th International Institute of Statistics & Management Engineering Symposium(IISMES2015) (第七届国际统计与管理工程学术研讨会)

山东 日照

英文

655-664

2015-08-17(万方平台首次上网日期,不代表论文的发表时间)