The using of production scheduling optimization model in cotton dyeing to reduce waste water discharge
This research mainly talk about of how to use production scheduling optimization to realize cleaner production of cotton dyeing enterprise,which means to improve water use efficiency and reduce energy consumption and improve production efficiency.Only using scheduling optimization,arranging production process,reducing unnecessary dye vats washing frequency and degree during production process to reduce the discharge of wastewater.
cotton dyeing clean production wastewater energy conservation and emissions reduction optimization of production scheduling
Lu Zhou Kun Xu
School of the Environment, Tsinghua University, Beijing 10086, China
国际会议
北京
英文
345-346
2015-11-02(万方平台首次上网日期,不代表论文的发表时间)