Field Trial of Process Bus Based Line Protection Using NCIT and CIT at Each Respective End

  We have developed the process bus system,standardized in IEC 61850-9-2, a new technology for substation secondary systems.The field trial of the developed system has been implemented in substations of a power utility and has been currently under operation.The system consists of non-conventional instrument transformers (NCIT), i.e., ECT (Electronic Current Transformer,primary converter is Rogowski CT: RCT) and EVT (Electronic Voltage Transformer, the primary converter is Potential Divider:PD) including A/D converter as the secondary converter installed in GIS (Gas Insulated Switchgear), MU (Merging Unit) and IED(Intelligent Electronic Device).Usages of NCIT will result in reduction of GIS size in comparison with conventional GIS using CIT (Conventional Instrument Transformers, CT and VT).As IEDs, line current differential relay and DFR (Digital Fault Recorder) are developed and installed in substations.This paper represents aspects of this pilot project, i.e.field trial and contributes to achieve the interoperability found through the pilot project.

A/D IEC 61850-9-2 IED MU NCIT Process bus

Keigo Adachi Masahiro Yamaguchi YaduyukiTanaka Tadatsune Sato

Mitsubishi Electric Corporation, Kobe 651-2271 Japan Mitsubishi Electric Corporation, Amagasaki 661-8661Japan

国际会议

第六届现代电力系统自动化和保护国际会议

南京

英文

181-186

2015-09-21(万方平台首次上网日期,不代表论文的发表时间)