Simulation and Verification of System Commissioning Test for the Second 750kV Channel Project Interconnecting Xinjiang Grid with Northwest China Main Grid
To ensure the commission of the Second 750kV channel Project Interconnecting Xinjiang Grid with Northwest China Main Grid, system test is needed to verify device performance and confirm the control strategy.In this paper, multi-FACTS system coordination control strategy in the second 750kV interconnecting channel is illustrated.The principle and method of verification test scheme design is proposed, and the multi-FACTS inter-station strategy verification test is detailed introduced to verify the feasibility.The dynamic disturbance test is simulated to confirm the dynamic model and parameters by comparing with measured results.The requisite technical foundation for system test planning and daily-operation is formed in this paper.
Dynamic Disturbance Test System Commissioning the Second 750kV channel project interconnecting Xinjiang grid with Northwest China main grid Verification Test of Multi-FACTS System Coordination control Strategy
Xuzhi Luo Jian Zhang Shuanbao Niu Bin Zheng JunchuanJia
China electric power research institute, Haidian Dsistrict,Beijing,100092 China China electric power research institute, Haidian Dsistrict,Beijing, 100092 China Northwest China Grid Company Limited, Lianhu Dsistrict, Xian, 710000 China
国际会议
南京
英文
724-728
2015-09-21(万方平台首次上网日期,不代表论文的发表时间)