会议专题

Integrated Loading and Transportation Problem:Complexity

  We consider an integrated loading and transportation problem that arises in a number of practical settings.In this problem,jobs first are loaded on semitrailers with a given capacity by a single crane and then delivered from a yard to a port by tractors.When the semitrailer and the tractor return to the yard,they may be separated such that the semitrailer may be loaded with new jobs while the tractor can pull another semitrailer loaded completely to the port.The problem is to find a joint loading and delivery schedule to minimize the arrival time of the last job.In this paper,we consider the problem that is motivated by real-world applications and analyze its computational complexity.

scheduling loading delivery computational complexity

Feng Li Wei Jiang

Liaoning Key Laboratory of Manufacturing System and Logistics, Institute of Industrial Engineering&L College of Engineering, ZheJiang Normal University, Jinhua 321004, China

国际会议

2016 2nd International Conference on Mechanical, Electronic and Information Technology Engineering(2016机械、电子和信息技术国际会议)

重庆

英文

41-44

2016-03-21(万方平台首次上网日期,不代表论文的发表时间)