Integrated Loading and Transportation Problem:Complexity
We consider an integrated loading and transportation problem that arises in a number of practical settings.In this problem,jobs first are loaded on semitrailers with a given capacity by a single crane and then delivered from a yard to a port by tractors.When the semitrailer and the tractor return to the yard,they may be separated such that the semitrailer may be loaded with new jobs while the tractor can pull another semitrailer loaded completely to the port.The problem is to find a joint loading and delivery schedule to minimize the arrival time of the last job.In this paper,we consider the problem that is motivated by real-world applications and analyze its computational complexity.
scheduling loading delivery computational complexity
Feng Li Wei Jiang
Liaoning Key Laboratory of Manufacturing System and Logistics, Institute of Industrial Engineering&L College of Engineering, ZheJiang Normal University, Jinhua 321004, China
国际会议
重庆
英文
41-44
2016-03-21(万方平台首次上网日期,不代表论文的发表时间)