Study on Technology of Cableway Station Tunnel Demolition Blasting in Scenic Area
By using reasonable delay of the blasting inside hole and outside hole and deep hole interval charging technology successfully demolished cableway station tunnel,effectively control the influence of blasting vibration on the Badaling Great Wall; use protective materials covered in explosion body,which can effective control of the blast flyrock,to ensures the safety of the equipment and facilities around the Great Wall.The successful experience of the blasting dismantled can be use for future similar tunnel construction,provide a reference implementation of the blasting operations around.
demolition of the tunnel millisecond delay blasting Badaling Great Wall protection technology
SHI Liansong GAO Wenxue LIU Dong CHEN Gui YAO Shaomin ZHU Xuyang
The College of Architecture and Civil Engineering,Beijing University of Technology,Beijing,China
国际会议
The 4th Asian-Pacific Symposium on Blasting Techniques(第四届亚洲太平洋地区爆破技术研讨会)
深圳
英文
152-156
2014-11-01(万方平台首次上网日期,不代表论文的发表时间)