Research on Blasting Scheme Matching Semi-continuous Mining Process Used in East Open Pit
East open pit mine stripping semi-continuous process system has been put into use,but the existing blasting technology hardly meets the need of fully mobile crushing stations semi-continuous process system and complete construction equipment for the blasting rock lumpiness and the security.As a result,optimization of blasting scheme supporting semicontinuous mining process is proposed and different blasting schemes are invested for research.Results suggest that by optimizing blasting initiation network,adjusting the charging structure,using pre-split blasting and other comprehensive blasting technology,it can effectively reduce the blasting rock lumpiness as well as the pre-shoot and the backward-turning distance of the blasting rock,eliminating security risks during deep hole blasting and making MMD fully mobile crushing stations semicontinuous process system working efficiently in East open pit.
mining engineering semi-continuous mining blasting scheme
LIU Xiaoming QI Maofu CHENG Fei
Shanxi China Coal Pingshuo Explosion Equipment Co.,Ltd.,Shanxi,China
国际会议
The 4th Asian-Pacific Symposium on Blasting Techniques(第四届亚洲太平洋地区爆破技术研讨会)
深圳
英文
202-206
2014-11-01(万方平台首次上网日期,不代表论文的发表时间)