The Application of Pre-splitting Blasting near Slope Technique in Yuanjiacun Iron Mine
The Yuanjiacun iron mine is currently under the side-hill cutting,mining in the horizontal 1725 m of the eastern stope is about to reach the final mining Area.The pre-splitting blasting technique scheme should be used to sustain the slope stability.it is necessary to determine a pre-splitting blasting scheme suitable for the mine lithology.The suitable Hole network parameters,explosive payload,loaded constitution and network connection are determined by reference to the pre-splitting blasting parameter in homo-mining area in China and carrying out small scale targeted experiment near slope.By analyzing experimental effects and making specific improvement measures,the pre-splitting blasting reaches the expected effect.
slope pre-splitting blasting hole network parameters explosive payload loaded constitution
JIA Chuanpeng
Taigang Group Lan Country Mining Co.,Ltd.,China
国际会议
The 4th Asian-Pacific Symposium on Blasting Techniques(第四届亚洲太平洋地区爆破技术研讨会)
深圳
英文
211-215
2014-11-01(万方平台首次上网日期,不代表论文的发表时间)