The Town of Rock Blasting Engineering under Complex Environment
The East soup hot spring reservoir is located in Fengcheng city,East Tang town center,the surrounding environment is very complex,short construction period,a large blasting dosage.Through segment millisecond,of hole by hole initiation by row,the explosive charge controlled in allowable range,strictly control the blasting vibration and flying rocks in blasting is the difficulty of blasting engineering,based on the test data regression analysis,ratio with correct,accurate control of blasting vibration; through strict control of flying rocks,on the surrounding buildings and facilities did not cause any influence of blasting project successfully completed.
pre-splitting blasting regression analysis non coupling charging blasting blasting vibration
JIN Huishi YUAN Maoyu LIU Chongyao TAO Yongsheng
Shenyang Xiaoying Blasting Engineering Co.,Ltd.,Shenyang,Liaoning,China
国际会议
The 4th Asian-Pacific Symposium on Blasting Techniques(第四届亚洲太平洋地区爆破技术研讨会)
深圳
英文
233-236
2014-11-01(万方平台首次上网日期,不代表论文的发表时间)