Blasting Demolition of L Shape Frame Structure Building in Downtown District
Blasting demolition of 8-storey L shape frame structure building in downtown district was introduced in the paper.The building consist of North-South parts and East-West parts,was divided into 2 independent parts by a 120mm wide settlement joint in the corner.Based on characteristics of building structure and surrounding environment condition,the overall blasting demolition scheme that utilized settlement joint,reasonable delay and collapsed in the same direction was proposed firstly.According to the overall scheme,the relays initiating circuit was designed that the delay time between 2 parts of the L shape was 460 ms,the blasting demolition parameters and safeguard measures were also introduced detailed.Advises for similar building were given based on analyzing the building collapse process,the muck pile and vibration monitoring results,which has a certain reference meaning for similar projects.
blasting demolition L shape frame structure building settlement joint collapse in the same direction initiating circuit
XIE Xianqi YAO Yingkang JIA Yongsheng LIU Changbang WANG Honggang
Wuhan Blasting Engineering Co.,Ltd.,Wuhan,Hubei,China;College of Civil and Transportation Engineerin Wuhan Blasting Engineering Co.,Ltd.,Wuhan,Hubei,China
国际会议
The 4th Asian-Pacific Symposium on Blasting Techniques(第四届亚洲太平洋地区爆破技术研讨会)
深圳
英文
313-318
2014-11-01(万方平台首次上网日期,不代表论文的发表时间)