Investigation of the Large Scale Borehole Soundless Cracking Experiment on the Concrete Members

  In this paper, by the large scale borehole soundless cracking method, the fracture experiments were performed on the plain concrete and reinforced concrete.For plain concrete experiment, the open borehole was prefabricated in the concrete pillar at first.Secondly, two non-woven fabric bags contained soundless cracking agent were prepared, one for the main expanding and the other for blocking.Thirdly, the main expanding bag was plugged, and then the blocking bag.At last, the cracks in the concrete pillar were developed within 3 hours.For reinforced concrete experiment, the closed boreholes were prefabricated in the concrete beam.First the strain gauges were pasted on the designed locations of the stirrups.Secondly, the boreholes were filled with expanding grout and closed by the flange.The beam was cracked afterwards, and the strain was measured by the test system.It is proved that the large scale borehole soundless cracking method on the concrete members is practicable.

Soundless cracking Large Scale borehole Concrete Member Strain

Quan-jun Xu Nan Jiang Yu Liao Tao Yang Ran Ji Di Liu

PLA University of Science and Engineering, Nanjing, China

国际会议

2014 SEM Fall Conference and International Symposium on Intensive Loading and Its Effects(国际实验力学学会2014年秋季会议、强化装载及其影响国际研讨会)

北京

英文

343-351

2014-10-19(万方平台首次上网日期,不代表论文的发表时间)