Material Handling for Primary Aluminium Production.It is all about people
Managing and maintaining an Aluminium Smelter at its optimum is a challenging job.One mistake, inferior joint on the anode, bad anode, sleepy operator or bad pot tending process can disrupt a pot in seconds.Once done it will take a pot months to recover from such a disruptor and get back to its most productive stage again.Nowadays a modem smelter has more pots running at higher amperage.The operational team needs to use these pots and manage their performance in order to reach an excellent operational result.In this paper we will discuss the need for equipment that gives a constant predictable performance as well as real time feedback on this performance of people and equipment to the management.We see this is the way forward to change industry operational know how from a reactive behaviour into a knowledge based pro-active behaviour.In this paper, a helping hand to Aluminium industry is offered form an unusual perspective.Your vehicle supplier.
Mobile Equipment Aluminium production real time data reliability
Maarten Meijer
国际会议
32th International Conference & Exhibition ICSOBA-2014(第32届国际铝土矿、氧化铝和铝工业技术学术年会)
郑州
英文
386-391
2014-10-12(万方平台首次上网日期,不代表论文的发表时间)