Research on mine ventilation system diagram by automatic drawing method
Researching the automatic generation algorithm of double tunnels, solving the problem of actual condition of roadway intersection place of blanking and implementing example visualization of dynamic loading on the basis of the original drawing method and the first-hand data of roadway position measurement.Ultimately achieve the minimal human intervention to complete automation of ventilation systems double Fig.drawing and editing tasks.It greatly improves the efficiency of drawing, meet the needs of site engineering and technical personnel mine chart drawing.
double-line figure automatic drawing module dynamic loading menu
XU Chao-jie CAI Feng DI Chun-jie JIA Fang-xu ZHAO Lu
School of Energy and Safety ,Anhui University of Science and Technology, Huainan 232001 ,China School of Energy and Safety ,Anhui University of Science and Technology, Huainan 232001 ,China;Key L Kunshang Limited Company of Henan Province,Shangqiu 476000,China
国际会议
International Mining Conference 2014(2014国际采矿论坛)
安徽淮南
英文
470-473
2014-09-19(万方平台首次上网日期,不代表论文的发表时间)