A HYBRID GENETIC ALGORITHM FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC OVERLAPPING MODES
In new product Research and Development (R&D) project, the project makespan is often shortened through activities overlapping.However, overlapping will bring rework risk, and lead to additional time and resource consumption.Here, we investigate resource-constrained project scheduling problems with stochastic overlapping modes, with an objective of minimizing the expected project makespan.First, an optimization model is established.Then, we design a hybrid simulation based genetic algorithm to solve the problem.Lastly, a project management example is given to demonstrate the efficiency of our provided algorithm.
Project scheduling Genetic Algorithm Activity overlapping Overlapping modes Rework risk
Fang Xie Jing Yu Zhe Xu
School of Economics and Management, Beihang University, Beijing 100191, China