会议专题

Coordinative Scheduling Problem of Single Machine Manufacturing and Delivery with Due Date Windows

  Considering capacity of transportation measured by space and delivery route constraints,a coordinative scheduling problem of single machine manufacturing and multiple customer delivery with due date windows was studied in this paper.A bi-level mathematic programming model was presented,and a PSO algorithm is proposed to solve the problem.Some computing tests were performed to compare the different algorithm strategies.

Manufacturing and delivery Coordinative scheduling Due date window PSO algorithm

Pang Hali

College of Information Science and Technology,Northeastern University,Shenyang 100819 China

国际会议

第26届中国控制与决策会议(2014 CCDC)

长沙

英文

3229-3234

2014-05-31(万方平台首次上网日期,不代表论文的发表时间)