An approach with Decomposition on Time Windows for Resource-Constrained Project Scheduling
An approach with decomposition on time windows is proposed to solve resource-constrained project scheduling problem(RCPSP)in this paper.This approach is to decompose the feasible space calculated by CPM of the original problem into some subspaces,which are searched using some schedule schema.Double justification is also performed in the search to improve the results.The results of experiments conducted on PSPLIB show the proposed method is effective and efficient.
Decomposition on Time Windows Project Scheduling Random Sampling Scheduling Schema Double Justification