会议专题

Study on Cement Clinker Burning Energy Efficiency

  To reduce the energy consumption and save energy, this paper has finished the study on cement clinker burning process energy efficiency and realized the online estimation on key parameters of energy efficiency ,such as coal calorific value, thermal efficiency and so on .For monitoring the real-time parameter, we have developed the energy efficiency analysis software .The software is based on the key energy efficiency model and includes data collection system, hot economic online calculation system, data analysis system, historical data storage and query system, help system and so on. It has finished real-time statistics and analysis of cement clinker burning process and played a good role in directing production.

Cement Clinker Burning Energy Efficiency

YU Hongliang YAO Chuanbo WANG Xiaohong

School of Electrical Engineering, University of Jinan, Jinan 250022, China

国际会议

第26届中国控制与决策会议(2014 CCDC)

长沙

英文

5198-5201

2014-05-31(万方平台首次上网日期,不代表论文的发表时间)