会议专题

Research on the problem of scheduling multi-product batches in the process industry

  With the diversification and personality of customer demand the modem chemical Polyester production has shifted to multi-product small batch production.The problem of the scheduling on multi-product small batch production is a new unresolved issue which is that people have been concerned about.This paper firstly analyzes the nature of the poly ester engineering process and the optimal characteristics of the problem.Based on the supply of materials and inventory constraints,the precedence relationships of the batches between the various stages are drawn.This paper applies continuous-time modeling strategy to establish mixed integer progamming model of the integrated problem of batching and scheduling The model consider the integration of batching and scheduling in decision-making and consider multi-product,conversion rate,set-up time and inventory constraints,and then give out an imp roved p article swarm optimization algorithm.The algorithm use two-dimensional coding on behalf of batch quantity to enhance the ability to resolve constrains.and brings out rep airing strategy,drifting strategy and scheduling strategy to decode a p article into a feasible solution of the problem.The introduction of the systolic and divergence operators can maintain p article diversity and convergence.The examples from enterprises verify that the model and the algorithm have good performance.This paper extends the batching and scheduling theory of the small batch production in the process industry,and provides methodological support and theoretical basis for the practices of the chemical poly ester production.

Particle Swarm Optimization batching scheduling process industries

TANG Qi ZHANG Qing-shan

The shool of Management,Shenyang University of Technology,Shenyang 110023,China

国际会议

第26届中国控制与决策会议(2014 CCDC)

长沙

英文

2702-2707

2014-05-31(万方平台首次上网日期,不代表论文的发表时间)