TWO QUICKER WORKERS OPTIMAL ASSIGNMENT UNDER A LIMITED-CYCLE PROBLEM WITH MULTIPLE PERIODS

  In most uncertain cases, the result and efficiency of a certain period (of a production cycle) are influenced not only by the risks which exist in current period but also by the risks which exist in the previous ones.Whats more, the risk itself is also affected greatly by the risks which exist in the earlier periods.This kind of problem is called a limited-cycle problem with multiple periods.This kind of problem is well known increasingly as a management science recent years.In this paper, we consider the property of the two quicker workers optimal assignment with minimized total of expected risk in a limited-cycle problem with multiple periods (LCPwMP).First, reset model as a simple model of LCPwMP is introduced.Then,the property of two quicker workers optimal assignment in reset model is summarized.Finally, the property is proved by a mathematical approach and the properties in the other cases are researched by Erlang distribution based numerical experiments.

Lmited-Cycle Problem with Multiple Periods Optimal Assignment Processing Efficiency Erlang Distribution

Xianda Kong Jing Sun Hisashi Yamamoto Masayuki Matsui

Department of System Design, Management Systems Engineering, Tokyo Metropolitan University 6-6 Asahi Graduate School of Engineering, Nagoya Institute of Technology, Gokiso-cho, Showa-ku,Nagoya, Aichi, Department of Industrial Engineering and Management, Kanagawa University, 3-27-1 Rokkakubashi, Kanag

国际会议

The 11th International Conference on Industrial Management(第十一届工业管理国际会议)

日本

英文

60-66

2012-08-29(万方平台首次上网日期,不代表论文的发表时间)