INCENTIVE MECHANISM DESIGN RESEARCH OF ENGINEERING PROJECT MANAGEMENT

  The article introduces cost plus incentive linear contract form by using incentive and restrain theory, considering the influence to the construction period which is brought about by the two incentive factors of cost and time limitation.Established between the owner and the contractor incentive mechanism, and makes the owner to pay minimum to his contract and realize the purpose of the incentive contractor.By using the engineering example has verified the incentive model is effective and feasible, providing a reference for the owner in the design for incentive contract.

Incentive Mechanism CPIF Contract Incentive Factors

Feng Yu Min Shen Zhong Shao

School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070,China Faculty of Economics, Management and Information Science, Onomichi City University, Onomichi 722-850

国际会议

The 11th International Conference on Industrial Management(第十一届工业管理国际会议)

日本

英文

249-251

2012-08-29(万方平台首次上网日期,不代表论文的发表时间)