The Study of Enterprise Technical Alliance Comprehensive Profit Allocation Based on Orthogonal Projection
We apply orthogonal projection to the profit allocation of a technical alliance based on traditional profit allocation methods,such as Shapely value,minimum core,simplified minimum costs remaining savings,and Nash negotiation methods.This distribution method is based on the weight coefficient of the first four profit allocation projects,and split the four different profit allocation methods into a comprehensive profit distribution plan.
technical alliance profit allocation orthogonal projection synergistic development
Wang Bo
School of Economics and Management,Huaiyin Normal University,Huaian,China 223300
国际会议
2015 Information Technology and Mechatronics Engineering Conference (ITOEC 2015)(2015信息技术与机电一体化国际会议)
重庆
英文
33-36
2015-03-28(万方平台首次上网日期,不代表论文的发表时间)