The Technique and Management of Investment Control in Metro Engineering
Metro engineering is a systematic engineering with a wide range,great investment,long construction cycle,and complex circuit.If improper handled,most likely engendering the investment exceeds budget estimate,thus affecting the economic and social benefits of projects.Throughout the development of metro engineering in decades,we have well-developed experience of construction and project management,but the old traditional pattern by administrative means has been still followed,not form a system,so it brings great limitations to the entire management process.Therefore,combined with the management mode of construction projects in our country,the article focuses on clearing the basic principle of the investment in metro engineering,pay attention to related technical details of investment control in process of the investment,particularly in design phase.With the help of efficiently and scientifically management,putting the course of investment management in place,so as to achieve general goal of infrastructure engineering construction with economical investment,fast progress,and preferable benefit.
Metro Engineering Investment Control Investment Management
Shunmao Mao Tingting Zhu
Wuhan University of Technology,Wuhan city,Hubei province,China East China Jiaotong University,Nanchang city,Jiangxi Province,China
国际会议
2015 Information Technology and Mechatronics Engineering Conference (ITOEC 2015)(2015信息技术与机电一体化国际会议)
重庆
英文
207-211
2015-03-28(万方平台首次上网日期,不代表论文的发表时间)